Datasheets & Compliance Documents
Documents for tender submissions and technical evaluation. Datasheets are being finalised alongside our approvals programme — request early access below and we will send what is ready directly.
Downloads
System datasheet
Full technical specification: pressure, droplet size, components and testing.
In preparation
Tunnel application one-pager
Zoned design summary for road, rail and metro tunnel tenders.
In preparation
Paint booth application one-pager
NFPA 33 / NFPA 750 design summary for spray booth suppression.
In preparation
Standards compliance matrix
Application-by-standard compliance mapping for tender submissions.
In preparation
Need a document that isn’t listed? Send us your requirement and we will prepare it for your evaluation.
Available now
What you can request today
The downloads above are in preparation, and we would rather say so than publish a datasheet ahead of the evidence behind it. What exists today is project-specific and available on request: a system concept for your application, the hydraulic basis behind it, and our written position against the standard your specification names.
Facility details, capacity information and quality documentation are also available to customers and project consultants on request. If you are assembling a tender pack and need a specific document in a specific format, ask for it directly rather than waiting for a download to appear.
Evaluation
What to ask any water mist supplier for
This applies to us as much as to anyone else you are evaluating, and it is the fastest way to tell a documented system from a confident one. Ask for three things: the full-scale fire test report, naming the protocol and the laboratory that ran it; the component test reports behind the nozzles, valves and pumps; and the DIOM manual the design rules actually come from.
The common substitution is a component certificate offered in place of a system fire test. They are not the same evidence: a certified nozzle says nothing about whether an arrangement of those nozzles controls the fire your project is designed around. Our own position is stated line by line in the standards ledger, and the reasoning behind that distinction is set out in system fire testing versus component certificates.
Next step
Request documents for your tender
Tell us the project, the governing standard and the submission date, and we will send what exists today and say plainly what does not.
Request documents